<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>News Archivi - Fondamenta SpA</title>
	<atom:link href="https://fondamentaspa.it/en/press/news-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://fondamentaspa.it/en/press/news-en/</link>
	<description>Ingegneria per il sottosuolo</description>
	<lastBuildDate>Thu, 04 Jul 2024 07:47:21 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.1</generator>

<image>
	<url>https://fondamentaspa.it/wp-content/uploads/2024/05/cropped-favicon-32x32.png</url>
	<title>News Archivi - Fondamenta SpA</title>
	<link>https://fondamentaspa.it/en/press/news-en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>High speed in deep work &#8211; Perforare</title>
		<link>https://fondamentaspa.it/en/high-speed-in-deep-work-perforare/</link>
		
		<dc:creator><![CDATA[Redazione]]></dc:creator>
		<pubDate>Mon, 13 May 2024 15:19:56 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://fondamentaspa.it/?p=2929</guid>

					<description><![CDATA[<p>With an invitation from a top delegation, we visited the AV station construction site in Florence Belfiore, inaugurated in its new phase with special foundations by Fondamenta. Highlighting the strategic CH 450 model equipped with a custom low headroom kit and complete setup for large diameters. Download the full article in PDF. Browse the complete [&#8230;]</p>
<p>L'articolo <a href="https://fondamentaspa.it/en/high-speed-in-deep-work-perforare/">High speed in deep work &#8211; Perforare</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">With an invitation from a top delegation, we visited the AV station construction site in Florence Belfiore, inaugurated in its new phase with special foundations by Fondamenta. Highlighting the strategic CH 450 model equipped with a custom low headroom kit and complete setup for large diameters.</span></p>
<h3><a href="https://fondamentaspa.it/wp-content/uploads/2024/05/Alta-velocita-in-opera-profonda.pdf" target="_blank" rel="noopener"><strong>Download the full article in PDF.</strong></a></h3>
<h3><a href="https://issuu.com/perforare/docs/perforare_nov23_gen24_2023_rid"><span style="font-weight: 400;">Browse the complete issue of Perforare.</span></a></h3>
<p>L'articolo <a href="https://fondamentaspa.it/en/high-speed-in-deep-work-perforare/">High speed in deep work &#8211; Perforare</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Consolidation of the San Giorgio in Salici Natural Tunnel – gallerie&#038;tunneling</title>
		<link>https://fondamentaspa.it/en/the-consolidation-of-the-san-giorgio-in-salici-natural-tunnel-gallerietunneling/</link>
		
		<dc:creator><![CDATA[Redazione]]></dc:creator>
		<pubDate>Tue, 16 Jan 2024 13:21:46 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://fondamentaspa.it/?p=2158</guid>

					<description><![CDATA[<p>The new AV/AC Brescia East-Verona railway line spans about 48 km, starting in Mazzano (BS) and reaching Verona, mostly running alongside existing infrastructures. The project involves a preliminary consolidation before tunnel excavation, executed in three phases due to interference with the highway. The first phase, covering the initial 170 meters, involved jet grouting with 1,200 [&#8230;]</p>
<p>L'articolo <a href="https://fondamentaspa.it/en/the-consolidation-of-the-san-giorgio-in-salici-natural-tunnel-gallerietunneling/">The Consolidation of the San Giorgio in Salici Natural Tunnel – gallerie&#038;tunneling</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">The new AV/AC Brescia East-Verona railway line spans about 48 km, starting in Mazzano (BS) and reaching Verona, mostly running alongside existing infrastructures. The project involves a preliminary consolidation before tunnel excavation, executed in three phases due to interference with the highway. The first phase, covering the initial 170 meters, involved jet grouting with 1,200 mm diameter columns using bifluid technique, followed by excavation.</span></p>
<h3><a href="https://fondamentaspa.it/wp-content/uploads/2019/10/StradeAutostrade-Fondamenta.pdf" target="_blank" rel="noopener">Download the full article in PDF<span style="font-weight: 400;">.</span></a></h3>
<p>L'articolo <a href="https://fondamentaspa.it/en/the-consolidation-of-the-san-giorgio-in-salici-natural-tunnel-gallerietunneling/">The Consolidation of the San Giorgio in Salici Natural Tunnel – gallerie&#038;tunneling</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Noise Reduction Specialization – leStrade</title>
		<link>https://fondamentaspa.it/en/noise-reduction-specialization-lestrade/</link>
		
		<dc:creator><![CDATA[Redazione]]></dc:creator>
		<pubDate>Tue, 23 Nov 2021 13:21:44 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://fondamentaspa.it/?p=2159</guid>

					<description><![CDATA[<p>Focus on the execution aspects that led to the installation of a noise-absorbing wall with corten steel panels along the sp ex ss 415 Paullese in East Milan. Despite high traffic density, the expertise of specialist Sirianni ensured timely completion, quality workmanship, and traffic fluidity. The project aimed to reduce noise in a high-traffic and [&#8230;]</p>
<p>L'articolo <a href="https://fondamentaspa.it/en/noise-reduction-specialization-lestrade/">Noise Reduction Specialization – leStrade</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="font-weight: 400;">Focus on the execution aspects that led to the installation of a noise-absorbing wall with corten steel panels along the sp ex ss 415 Paullese in East Milan. Despite high traffic density, the expertise of specialist Sirianni ensured timely completion, quality workmanship, and traffic fluidity. The project aimed to reduce noise in a high-traffic and residential area near Linate Airport, promoted by the Metropolitan City of Milan, known for advocating new technologies like graphene-containing asphalt.</span></p>
<h3><a href="https://fondamentaspa.it/wp-content/uploads/2021/11/STRADE-SIRIANNI.pdf" target="_blank" rel="noopener">Download the full article in PDF.</a></h3>
<p>L'articolo <a href="https://fondamentaspa.it/en/noise-reduction-specialization-lestrade/">Noise Reduction Specialization – leStrade</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Everything easy, everything safe &#8211; Autec</title>
		<link>https://fondamentaspa.it/en/everything-easy-everything-safe-autec/</link>
		
		<dc:creator><![CDATA[Redazione]]></dc:creator>
		<pubDate>Fri, 23 Nov 2018 13:21:50 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://fondamentaspa.it/?p=2160</guid>

					<description><![CDATA[<p>In Peschiera, in the heart of the construction site for the new high-speed railway line, we saw a C9 Casagrande at work equipped with an Autec radio control that manages its movements and entire operational functionality. We are on one of the most important construction sites in Italy: the new HS/AC Brescia Est-Verona railway line. [&#8230;]</p>
<p>L'articolo <a href="https://fondamentaspa.it/en/everything-easy-everything-safe-autec/">Everything easy, everything safe &#8211; Autec</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In Peschiera, in the heart of the construction site for the new high-speed railway line, we saw a C9 Casagrande at work equipped with an Autec radio control that manages its movements and entire operational functionality.</p>
<p>We are on one of the most important construction sites in Italy: the new HS/AC Brescia Est-Verona railway line. The work is entrusted to the Cepav Due Consortium, which is made up of some of the most significant companies in the infrastructural world of our country, namely: Saipem, Pizzarotti and Gruppo ICM. The route mostly runs alongside existing infrastructure, approximately 30 km parallel to the A4 motorway and approximately 8 km in alignment with the railway line.</p>
<h3><a href="https://fondamentaspa.it/wp-content/uploads/2018/11/Autec_Tutto_facile_tutto_sicuro_1693072852.pdf" target="_blank" rel="noopener"><strong>Download the full article in PDF.</strong></a></h3>
<p>L'articolo <a href="https://fondamentaspa.it/en/everything-easy-everything-safe-autec/">Everything easy, everything safe &#8211; Autec</a> proviene da <a href="https://fondamentaspa.it/en">Fondamenta SpA</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
